Open full test in the appQ1. Raising of outer edge of a road with respect to inner edge is known......
- A. Super elevation
- B. banking
- C. cantt
- D. all the above
Q2. If the elevations along a road increase, the slope of the road along the longitudinal direction is known as....
- A. positive grade
- B. grade
- C. negative grade
- D. Gradient
Q3. The type of transition curves generally provided on hill roads is........
- A. lemniscates
- B. cubic parabola
- C. spiral
- D. Circular
Q4. Bottom-most component of a flexible pavement is.......
- A. Base
- B. base course
- C. sub grade
- D. sub base
Q5. The minimum road width is taken......
- A. 12 m
- B. 9 m
- C. 20 m
- D. 16 m
Q6. The minimum super elevation in rolling terrain in plains is limited to....
- A. 5 %
- B. 7 %
- C. 4 %
- D. 10 %
Q7. Reference pillars fixed on the center line of a proposed road provide the following information.......
- A. Formation level of the road
- B. Reduced distance (R.D)
- C. Horizontal distance of road from the center line reduced level at the top of pillar
- D. all the above
Q8. Hydrographic surveys deal with the mapping of....
- A. heavenly bodies
- B. Large water bodies
- C. Mountainous region
- D. canal system
Q9. An ideal vertical curve to join two gradients is......
- A. Circular
- B. hyperbolic
- C. elliptical
- D. parabolic
Q10. Removal of parallax may be achieved by focusing......
- A. The objective
- B. the objective and the eye-piece
- C. the eye-piece
- D. none of these
Q11. Back bearing of a line is equal to......
- A. Fore bearing ± 90°
- B. Fore bearing ± 270°
- C. Fore bearing ± 180°
- D. Fore bearing ± 360°
Q12. The reduced bearing of a line is N 87° W. Its whole circle bearing is....
- A. 87°
- B. 273°
- C. 3°
- D. 93°
Q13. Surveys which are carried out to depict mountains, rivers, water bodies, wooded areas and other cultural details, are known as......
- A. guide map surveys
- B. city surveys
- C. Cadastral surveys
- D. topographical surveys
Q14. Inert material of a cement concrete mix is......
- A. cement
- B. Water
- C. aggregate
- D. none of these
Q15. Placing of concrete should preferably be done at a temperature of......
- A. 27 ± 2°C
- B. 10°C
- C. 23°C
- D. 20°C
Q16. The maximum percentage of chemical ingredient of cement is that of......
- A. silica
- B. lime
- C. Iron oxide
- D. aluminum
Q17. Sand generally contains salt if it is obtained from......
- A. sea beds
- B. river beds
- C. nala beds
- D. all the above
Q18. The impurity of mixing water which affects the setting time and strength of concrete is.......
- A. sodium chlorides
- B. Sodium carbonates and bicarbonates
- C. calcium chlorides
- D. Sodium sulphates
Q19. The bulk density of aggregates depends upon....
- A. grading
- B. Shape
- C. compaction
- D. all the above
Q20. Horizontal construction joints in concrete walls are generally provided at....
- A. Soffit level
- B. floor level
- C. window sill level
- D. all the above
Q21. Vacate apparatus is used for......
- A. test for setting time
- B. consistency test
- C. test for tensile strength
- D. Fineness test
Q22. A bearing of a line is also known as....
- A. azimuth
- B. true bearing
- C. Magnetic bearing
- D. reduced bearing
Q23. Closed contours of decreasing values towards their center represent......
- A. a saddle or pass
- B. a depression
- C. A hill
- D. a river bed
Q24. The constant vertical distance between two adjacent contours, is called......
- A. Horizontal interval
- B. horizontal equivalent
- C. Vertical equivalent
- D. contour interval
Q25. The wedge-shaped bricks forming an arch ring, are called....
- A. spandrels
- B. haunches
- C. voussoirs
- D. Soffits