Quantity Surveying MCQs (Diploma Civil 2nd Year)
Free MCQs with answers for Quantity Surveying. 145 questions in 8 chapter tests are in the app; a sample of 25 is shown here.
Open full test in the appQ1. An art to collect data about material and cost required for a project is called
- A. Quantity survey
- B. Estimation
- C. S.D.O
- D. a and b
Q2. Quality of any material and construction work is described by .....
- A. Cost
- B. Specifications
- C. Drawing
- D. all of these
Q3. Such estimate is prepared to get administrative approval.
- A. Revised
- B. Detailed
- C. Rough Cost
- D. All of these
Q4. Horizontal distance between centroids of the sections of cutting and filling is termed as
- A. I.M.P
- B. Interval
- C. Lead
- D. Lift
Q5. A prepared surface of soil which receives load of traffic from pacca road is called
- A. Sub-grade
- B. Topping
- C. Sub-base
- D. Base
Q6. Overall cost of any item of work is determined per unit quantity of work by
- A. Tender
- B. Analysis of rates
- C. Quatation
- D. Estimate
Q7. Lowest level inside the sewer pipe is called
- A. Bed level
- B. Crest level
- C. Invert level
- D. Minimum level
Q8. The process of assessing the present value of a property is called
- A. Valuation
- B. Estimate
- C. Analysis
- D. All of these
Q9. A person whose job is to calculate quantities for a project is called
- A. Quantity surveyor
- B. Estimator
- C. S.D.O
- D. a and b
Q10. Specifications are essential part of
- A. Contract
- B. Estimate
- C. Tender
- D. all of these
Q11. Such estimate is prepared to get technical sanction.
- A. Rough Cost
- B. Revised
- C. Detailed
- D. All of these
Q12. Vertical distance between centroids of the sections of cutting and filling is termed as
- A. Lead
- B. Interval
- C. I.M.P
- D. Lift
Q13. This is provided in the construction of road if soil is weak.
- A. Sub-grade
- B. Base
- C. Topping
- D. Sub-base
Q14. The volume of one bag of cement in M.K.S system is to be
- A. .025 cum
- B. .35 cum
- C. .035 cum
- D. .25 cum
Q15. Construction work of a sewer line should be started from ................... side.
- A. Upper side
- B. Middle side
- C. End side
- D. Any where
Q16. Actual expenditure on construction of a building is called its
- A. Gross value
- B. Value
- C. Scrap value
- D. Cost
Q17. Necessary data for preparing an estimate of a project is
- A. Rates
- B. Drawings
- C. Specifications
- D. All of these
Q18. Type of specifications is
- A. Detailed
- B. Standard
- C. General
- D. All of these
Q19. Area occupied by walls is ------------- in the plinth area.
- A. Included
- B. Excluded
- C. a or b
- D. a and b
Q20. More accurate method of calculating earth work is
- A. Mean depth
- B. Mean area
- C. Prismoidal
- D. Graphical
Q21. Compulsory part of structure of road which is responsible to protect sub grade is called
- A. Base
- B. Sub-base
- C. Sub-grade
- D. Topping
Q22. Volume of one bag of cement is;
- A. 3 cft
- B. 2.5 cft
- C. 1.25 cft
- D. 1.5 cft
Q23. Longitudinal slope of a sewer line is called
- A. Country slope
- B. Gradient
- C. Cross slope
- D. Camber
Q24. Present market value of the property is called its
- A. Cost
- B. Scrap value
- C. Gross value
- D. Value
Q25. Design of project is presented by
- A. Rates
- B. B.O.Q
- C. M.B
- D. Drawings