Open full test in the appQ1. Nearly Liter of water per bag of cement is required.......
- A. 30
- B. 25
- C. 35
- D. 28
Q2. The raw material manufacturing of glass is.......
- A. potash
- B. Silica
- C. lime
- D. all of these
Q3. Thickness of D.P.C layer of concrete (1:2:4) ....
- A. 1"
- B. 2"
- C. 3'’
- D. 1.5"
Q4. Making the surface rough before finishing the surface is termed as....
- A. dobbing
- B. rendering
- C. hacking
- D. Back ground
Q5. Revolved section is also called....
- A. Rolled section
- B. Half section
- C. partial section
- D. full section
Q6. Minimum size of kitchen......
- A. 2 sq.m
- B. 3 sq.m
- C. 4 sq.m
- D. 5 sq.m
Q7. View of orthographic projections is......
- A. Top view
- B. front view
- C. side view
- D. all of these
Q8. Writing on drawing sheet is called....
- A. Writing
- B. Lettering
- C. Numbering
- D. Sketching
Q9. Boundary lines of still water in lake shows....
- A. Horizontal surface
- B. Level surface
- C. vertical surface
- D. Contour line
Q10. Leveling, centering and orientation of plane table is called as......
- A. radiation
- B. Setting
- C. intersection
- D. centering
Q11. Bench mark established at the end of days leveling work is called......
- A. Permanent B.M
- B. GTS B.M
- C. Arbitrary
- D. Temporary B.M
Q12. The method of surveying in which the field work and plotting is done simultaneously is Called....
- A. Plane table survey
- B. Compass survey
- C. Tachometry survey
- D. Chain survey
Q13. The specification not included in departmental standard specification is called.........
- A. Special
- B. General
- C. Detailed
- D. Standard
Q14. More accurate method of calculating earth work is........
- A. mean area
- B. Mean depth
- C. graphical
- D. prismoidal
Q15. A table showing quantity of materials required for a particular work is called........
- A. analysis of rate
- B. Estimate
- C. material statement
- D. none of these
Q16. Measuring unit of base of roads is.........
- A. cft
- B. rft
- C. sft
- D. all of these
Q17. Method of permanent expulsion of ground water....
- A. grout injection
- B. Diaphragm wall
- C. continuous pile
- D. all of these
Q18. Ratio of fine and coarse aggregate uses in hollow block....
- A. 1:3
- B. 2:2
- C. 1:1
- D. 2:3
Q19. A floor of building constructed at ground level is called....
- A. Suspended ground
- B. first floor
- C. ground floor
- D. basement floor
Q20. The temporary structure constructed to support a safe working plate form for working is called....
- A. scaffolding
- B. Form work
- C. under pinning
- D. shoring
Q21. M.O.I of a Square is......
- A. D4/06
- B. D4/24
- C. D4/36
- D. D4/12
Q22. Uniformly distributed load is also called....
- A. triangular load
- B. Rectangular load
- C. trapezoidal load
- D. equivalent load
Q23. Ratio of shear stress to shear strain with in elastic limit....
- A. modulus of rigidity
- B. section modulus
- C. bulk modulus
- D. Young modulus
Q24. Modulus of section of a square beam....
- A. D4/12
- B. D4/6
- C. D4/12
- D. D3/6
Q25. PVC stands for....
- A. polymer viscosity control
- B. polypropylene chloride
- C. poly vinyl concrete
- D. Polyvinyl chloride